The automatic air duct production line 2 is mainly used for the preliminary work of air duct shearing. Its function is to levelling, beading, notching (capable of notching sharp mouth and square mouth) and shear the plate. Compared with the automatic air duct production line 5, it has only completed the preliminary preparations. Additional equipment is required for the forming of pittsburgh, double flange forming and “口” shape folding. The production line 2 of fully automatic air duct does not need to be operated by multiple people. After entering the production program, the system will automatically feed and manufacture, and the workers will be responsible for handling the formed pipeline. The whole production speed of the automatic air duct production line 2 with two electric material racks can reach 18m / min.
Performance Features
Function
Main Import Configuration
Basic Configuration
Working Schematic Diagram
Work Flow
Take your metalworking to the next level with our high-performance machines.
Contact us for a FREE quote and see how we can help your projects succeed.